top of page
Room Temperature

PROJECTS

Building Under Construction
Minaret college

 

10 units and toilet extraction was fitted to this building, with no veriations or extra costs to the client.

all units where mounted on the roof so they where out of the way of walkways and avoid damage to units and to complement the building when land scaping was completed.

Industrial Building
Extraction Systems

 

In this setup of a science wing at one of our schools there where 5 fantech extraction fans installed to give the room the requied ventilation needed. this job also finished on budjet.  

Building Entrance
Maintenance

 

This is one of our many schools that we maintain there systems to keep them up to date on there equipment needs. 

Green Building
The BLOCK
YES Arctic Air The Coolest Air In Town Was On The BLOCK

 

2014 Seson of the block Fan's VS Favourties

Chantelle and Steve

Kyal and Kara

Brad and Dale

Alisa and Lysandra

 

ARC AU31053

bottom of page